Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-38863EAGLE E
14-79HN
NOBLE ENERGY INC
100322
PR
8/1/2020
WATTENBERG
90750
WELD  123
SWSW 14 6N65W 6
435930View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400420668
8/5/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02 )
400420668
9/11/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below and 200’ above Parkman. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02 )
400420668
9/11/2013
Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 per the DJ Basin Horizontal Offset Policy, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Dinner #13-33 API #05-123-22370 Palser E. #14-23 API #05-123-22616 Schwisow E. #14-16 API #05-123-16126 Schwisow E. #14-09 API #05-123-16125 Dinner #14-32 API #05-123-21943 Dinner #14-31 API #05-123-21944 Dinner #1 API #05-123-10788 Dinner #15-43 API #05-123-20032 Mel Bickling #31-22 API #05-123-11059 Bickling E. #22-8 API #05-123-18788 Dinner #23-2 API #05-123-17767 Feit E. #23-5 API #05-123-17728 Feit E. #23-3 API #05-123-17727 Feit #2-23 EG API #05-123-12056 Ryan #1-26 EG API #05-123-07431
PermitForm: (02 )
400420668
1/14/2014
Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013.
PermitForm: (02 )
400420668
1/14/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire well bore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Form 5 for every well on the pad shall identify which well was logged.
EngineerForm: (02 )
400420668
1/21/2014
Operator acknowledges the proximity of the listed non operated wells. Operator agrees to provide mitigation Option 1 or 2 per the DJ Basin Horizontal Offset Policy, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. JR #1 API #05-123-12840 Benson #24-15 API #05-123-14705 Benson #13-15 API #05-123-12942 Willson #1-15 API #05-123-13327 Riggs #44-16 API #05-123-14480 Ole #21-24 API #05-123-23634 Ole #4-24 API #05-123-13239
EngineerForm: (02 )
400420668
1/21/2014
Operator acknowledges the proximity of the listed non producing wells. Operator agrees to provide mitigation Option 3 per the DJ Basin Horizontal Offset Policy, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Bickling #1 API #05-123-13024 Dinner #15-1 API #05-123-10987 Dinner #15-2 API #05-123-11166 Mel Bickling #11-22 API #05-123-10719
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
General HousekeepingForm: (02 )
400420668
1/21/2014
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be conducted at the end of each work day. Cleanup will consist of patrolling the roadway, access areas, and other work areas to pickup trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.
Storm Water/Erosion ControlForm: (02 )
400420668
1/21/2014
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with Oil & Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE) General Permit No. COR-038637. BMP's will be constructed around the perimeter of the site prior to, or at the beginning of construction. BMP's used will vary according to the location, and will remain in place until the pad reaches final reclamation
Material Handling and Spill PreventionForm: (02 )
400420668
1/21/2014
Spill prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with Oil & Gas operations throughout the state of Colorado in accordance with CFR 112.