Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-38734Antelope
31-34-15HNB
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
PR
9/1/2025
WATTENBERG
90750
WELD  123
NWNE 15 5N62W 6
435681View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400509308
12/12/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. The Completed Interval Report, Form 5A will explicitly detail how those portions of the well outside of the legal setback are isolated from production.
EngineerForm: (04)
404060122
02/28/2025
Alternative MIT is granted for a period ending 3/31/2026. If not returned to production by 3/31/2026 operator shall perform an MIT. Due to the removal of surface facilities and sales lines, this well is considered Temporarily Abandoned. All other temporary abandonment requirements remain in place including a TA sundry, a 5A, and Form 7 reporting. Furthermore, all Inactive well requirements remain in full effect.
EngineerForm: (04)
404145939
04/11/2025
1) Well last produced November 2024, and has been designated as Inactive. Within 6 months of a Well becoming Inactive action must be taken. No later than November 2025, this well must: A. Be plugged and Abandoned, B. Return to production so that it is no longer an Inactive Well, C. Have an approved Form 5B, Inactive Well Notice, D. Be designated as Out of Service by submitting a Form 6A, Out of Service Designation.
 
COGIS - Best Management Practice Results
No records to display.