Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-38607NRC
3C-4HZX
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
11/1/2018
WATTENBERG
90750
WELD  123
SESW 9 1N67W 6
435425View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400508595
11/19/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02 )
400508595
12/6/2013
Note: Request for omission of Open Hole Logging not accepted. A full suite of open hole logs is required for one well on this pad. Operator will place an explicit comment on the Drilling Completion Report documenting which well on this pad was logged with a full suite of open hole logs.
EngineerForm: (02 )
400508595
12/6/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below the Sussex to 200’ above Sussex. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02 )
400508595
12/6/2013
Operator acknowledges the proximity of the following wells: Mace 11-4 API 123-21035, Donald E. Miller Unit C2 API 123-10285, Rocky Mtn Fuel Co Unit G2 API 123-10062, Donald E. Miller Unit C1 API 123-07844, Rocky Mtn Fuel Co "F" 2 API 123-07798, Willard Hein Gas Unit 1 API 123-07624, Rocky Mtn Fuel Co G Unit 1 API 123-07841, Rocky Mountain Fuel Co F3 API 123-09958, Willard Hein Gas Unit 2 API 123-10040, Carl A Miller Unit C1 API 123-07846 . Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
EngineerForm: (02 )
400508595
12/6/2013
Operator acknowledges the proximity of the Scheidt State VV 16-03 API 123-16030, Scheidt State VV 16-02 API 123-15867, Scheidt State VV 16-04 API 123-16022, Scheidt State 1-16 API 123-14609, non-operated wells. Operator assures that these offsets will be remediated per the DJ Basin Horizontal Offset Policy (options 1,2 or 3) or operator will address this well with mitigation option 4. Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400508595
12/13/2013
The nearest building unit is located 1,934'’ away from this oil and gas location, therefore it is not within a Designated Setback Location and is exempt from 604.c.
Drilling/Completion OperationsForm: (02 )
400508595
12/13/2013
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
Drilling/Completion OperationsForm: (02 )
400508595
12/13/2013
Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.
General HousekeepingForm: (02 )
400574195
3/19/2014
SEE ORIGINAL APD FOR BMPS