COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400512419
11/20/2013
Operator acknowledges the proximity of the non-operated STATE 1-16 (API # 123-07196) well. Operater has made application to re-enter/re-plug this well, Doc. # 400508232. Operator assures that this offset will be remediated per the DJ Basin Horizontal Offset Policy (option 3) or operator will address this well with mitigation option 4. Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
EngineerForm: (02)
400512419
11/20/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. The Drilling Completion Report, Form 5 and the Completed Interval Report, Form 5A will explicitly detail how those portions of the well outside of the legal setback are isolated from production.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400512419
12/12/2013
Operator has designed the well pad with in-sloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Material Handling and Spill PreventionForm: (02 )
400512419
12/12/2013
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
ConstructionForm: (02 )
400512419
12/12/2013
The location will be fenced.
Drilling/Completion OperationsForm: (02 )
400512419
12/12/2013
Operator will implement interim reclamation measures immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds on the location.