| Storm Water/Erosion Control | Form: (02 ) 400512419 12/12/2013 | Operator has designed the well pad with in-sloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing. |
| Material Handling and Spill Prevention | Form: (02 ) 400512419 12/12/2013 | Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. |
| Construction | Form: (02 ) 400512419 12/12/2013 | The location will be fenced. |
| Drilling/Completion Operations | Form: (02 ) 400512419 12/12/2013 | Operator will implement interim reclamation measures immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds on the location. |