COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400490921
11/14/2013
1)Provide 48 hour notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per Rule 317.o.
EngineerForm: (04)
400668600
08/20/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400490921
11/29/2013
Multi-well Pads. It is a multi-well pad located in a manner which allows for resource extraction while maintaining the highest distances passible from the offsetting residential areas.
Traffic controlForm: (02 )
400490921
11/29/2013
Traffic Plan. Traffic plans will be reviewed with the Town of Windsor in order to minimize impact to streets and residents.
Traffic controlForm: (02 )
400490921
11/29/2013
Access roads. The access road will be constructed to accommodate local emergency vehicles. This road will be maintained for access at all times.
General HousekeepingForm: (02 )
400490921
11/29/2013
Fencing requirements. A permanent plan will be reviewed by the surface owner, the applicant
General HousekeepingForm: (02 )
400490921
11/29/2013
Removal of surface trash. All trash, debris and material not intrinsic to the operation of the oil and gas facility shall be removed and legally disposed of as applicable
Material Handling and Spill PreventionForm: (02 )
400490921
11/29/2013
Leak Detection Plan. Pumper will visit the location daily and visually inspect all tanks and fittings for leaks. Additionally, monthly documented SPCCP inspections are conducted pursuant to 40 CFR §112.
Material Handling and Spill PreventionForm: (02 )
400490921
11/29/2013
Loadlines. All loadlines shall be bullplugged or capped
Material Handling and Spill PreventionForm: (02 )
400490921
11/29/2013
Tank specifications. Tanks will be designed, constructed and maintained in accordance with NFPA Code 30. The tanks are visually inspected once a day for issues, and recorded inspections are conducted once a month.
ConstructionForm: (02 )
400490921
11/29/2013
Berm construction. Tank berms shall be constructed of steel rings with a synthetic or engineered liner and designed to contain 150% of the capacity of the largest tank. All berms will be visually checked periodically to ensure proper working condition.
Emissions mitigationForm: (02 )
400490921
11/29/2013
Green Completions – Emission Control Systems. Test separators and associated flow lines and sand traps shall be installed on-site to accommodate Green completions techniques pursuant to COGCC Rules. In the anticipated absence of a viable gas sales line, the flowback gas shall be thermally oxidized in an emissions control device (ECD), which will be installed and kept in operable condition for least the first 90-days of production pursuant to CDPHE rules. This ECD shall have an adequate capacity for 1.5 times the largest flowback within a 10 mile radius, will be flanged to route gas to other or permanent oxidizing equipment and shall be provided with the equipment needed to maintain combustion where non-combustible gases are present.
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Closed Loop Drilling Systems – Pit Restrictions. Not applicable; a closed-loop system will be used for drilling.
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Blowout preventer equipment (“BOPE”). A double ram and annular preventer will be used during drilling. At least the drilling company shall have a valid well blowout prevention certifications.
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
BOPE for well servicing operations. Adequate BOP equipment shall be used. Stabbing valves shall be installed in the event of reverse circulation and shall be prior tested with low and high pressure fluid.
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Pit level indicators. Not applicable; a closed-loop system will be used and no pits shall be dug
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Drill stem tests. Not applicable; no Drill Stem tests are planned.
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Control of fire hazards. All materials which are considered fire hazards shall be a minimum of 25’ from the wellhead tanks or separators. Electrical equipment shall comply with API RP 500 and will comply with the current national electrical code. An emergency response plan has been generated for this site, please see the attached “EMERGENCY RESPONSE AND FIRE PROTECTION PLAN: DIAMOND VALLEY EAST LOCATION"
Drilling/Completion OperationsForm: (02 )
400490921
11/29/2013
Guy line anchors. All guy line anchors shall be brightly marked pursuant to Rule 604.c(2)Q.
Final ReclamationForm: (02 )
400490921
11/29/2013
Well site cleared. Within 90-day subsequent to the time of plugging and abandonment of the entire site, superfluous debris and equipment shall be removed from the site.
Final ReclamationForm: (02 )
400490921
11/29/2013
Identification of plugged and abandoned wells. P&A’d wells shall be inditified persuant to 319.a.(5).