COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400490450
11/20/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02)
400490450
11/20/2013
Operator acknowledges the proximity of the non-operated STATE 1-16 (API # 123-07196) well. Operater has made application to re-enter/re-plug this well, Doc. # 400508232. Operator assures that this offset will be remediated per the DJ Basin Horizontal Offset Policy (option 3) or operator will address this well with mitigation option 4. Operator will submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400490450
11/21/2013
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Pre-ConstructionForm: (02 )
400490450
11/21/2013
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
Storm Water/Erosion ControlForm: (02 )
400490450
11/21/2013
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Material Handling and Spill PreventionForm: (02 )
400490450
11/21/2013
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
ConstructionForm: (02 )
400490450
11/21/2013
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Drilling/Completion OperationsForm: (02 )
400490450
11/21/2013
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use. Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source. Operator will implement interim reclamation measures immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds on the location.