| Engineer | Form: (02) 400469941 09/18/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (02) 400469941 09/19/2013 | Clear to drill and stimulate with no setback from reported location of the State #1-26 per meeting with Diana Burn and Stuart Ellsworth. BCEI conducted extensive efforts to locate State #1-26, which ultimately was not located. BCEI required to monitor the surface area around the reported location during fracture stimulation. |