| Permit | Form: (02) 400446316 08/22/2013 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (02) 400446316 08/30/2013 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU..
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (02) 400875472 12/07/2015 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU..
2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) Operator will perform an anti-collision evaluation of all active (producing, shut in, or temporarily abandoned) offset wellbores that have the potential of being within 150 feet of a proposed well prior to drilling operations for the proposed well. Notice shall be given to all offset operators prior to drilling. |
| Engineer | Form: (02) 400875472 12/07/2015 | Operator acknowledges the proximity of the listed wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OFFSET MITIGATION COMPLETED”) stating that appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well.
Brown C Unit 1 API: 05-123-11011; Nelson E Unit 2 API: 05-123-10538 |
| Permit | Form: (02) 400875472 04/15/2016 | Approval of this refile APD does not provide relief from compliance with the COGCC Reclamation Rules.
|
| Permit | Form: (02) 400875472 04/18/2016 | The Designated Setback BMP's were added to the Form 2A. Doc # 400949226 must be posted on location.
|
| Engineer | Form: (04) 401219945 03/01/2017 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU (spud notice) for the first well activity with a rig on the pad and provide 48 hour spud notice via Form 42 for all subsequent wells drilled on the pad.
2) Comply with Rule 317.j. and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) This Form 4 makes changes to the approved Form 2 and must be displayed with the Form 2 while drilling. |
| Engineer | Form: (04) 401219945 03/01/2017 | Bradenhead tests shall be performed according to the following schedule and the Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release and prior to stimulation and
2) If a delayed completion, 6 months after rig release and prior to stimulation.
3) Within 30 days after first production, as reported on Form 5A. |
| Engineer | Form: (04) 402045559 06/29/2019 | 1) Any gas produced from the Bradenhead will be controlled with the best available technology to protect health and safety. Operator will ensure that any emissions do not constitute a nuisance or hazard to public welfare and are subject to CDPHE regulations.
2) Operator will blow down surface casing to 0 psi and shut in. Pressure will be allowed to build to 50 psi or for 48 hrs. Repeat cycle. During the blow down and build up cycles, the pressure and rate will be recorded in such a way as to characterize the well performance for comparison over time.
3) Commencing with the submission of this sundry, Operator will perform up to 12 weeks of blow down and build up cycles to be followed by a summary of well performance submitted via sundry to the COGCC at which time the future course of action will be considered.
|
| Engineer | Form: (04) 402179343 01/13/2020 | Monitor monthly and if at any time bradenhead pressure exceeds 50 psi, conduct a new bradenhead test and submit the Form 17 within ten days of the test along with a sundry describing remediation plans for the well. |