Permit | Form: (02 ) 400459693 8/21/2013 | Operator must meet water well testing requirements per Rule 318A. |
Engineer | Form: (02 ) 400459693 9/25/2013 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the end of the 7” casing shoe to a minimum of 200' above Niobrara, and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. The operator shall comply with Rule 321, and it shall be the operator’s responsibility to ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (02 ) 400459693 9/25/2013 | Operator acknowledges the proximity of the UPRR 38 Pan Am “M” 1, (API NO 123-10053), and the UPRR 50 Pan Am F 1,( API NO 123-09641 wells. Operator agrees to: provide mitigation option 1 or 2 (per the DJ Basin Horizontal Offset Policy) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. |