Material Handling and Spill Prevention | Form: (02 ) 400469358 9/13/2013 | Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed. |
Material Handling and Spill Prevention | Form: (02 ) 400469358 9/13/2013 | Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado.
• Materials and fluids will be stored in a neat and orderly fashion.
• Waste will be collected regularly and disposed of at an offsite facility.
• Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff.
• Drip pans will be used during fueling and maintenance to contain spills or leaks.
• Cleanup of trash and discarded material will be done at the end of the work day.
• Cleanup will consist of monitoring the road, location and any other work areas.
• Material to be cleaned up includes trash, scrap, and contaminated soil.
|
Drilling/Completion Operations | Form: (02 ) 400469358 9/13/2013 | The casing will be driven. There are no existing wells within 1500 feet of the well bore. Wells Planned within 1500 feet are shown on the multi-well plan map. |