Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-38006HOWARD
2N-33HZR
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
4/23/2014
WATTENBERG
90750
WELD  123
NENE 28 1N67W 6
318894View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400466007
8/30/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02 )
400466007
9/12/2013
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage from the 7” casing TD to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with a cement bond log.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (02 )
400466007
9/12/2013
604c.(2).E. Multiwell Pads: This re-drill well application is part of a six-well pad. The associated Oil and Gas Location Assessment (Form 2A) has been approved by the COGCC.
Traffic controlForm: (02 )
400466007
9/12/2013
604c.(2).D. Traffic Plan: A traffic plan is not required by the local government for this well location. Weld County Road 6 (North) and County Road 19 (East) are both paved and maintained by Weld County and will therefore not require dust mitigation. KMG has offset the access road to avoid traffic interference with the residence to the North.
Traffic controlForm: (02 )
400466007
9/12/2013
604c.(2).S. Access Roads: KMG will utilize the lease access road from WCR 6 for drilling operations and maintenance equipment. The road will be properly constructed and maintained to accommodate for local emergency vehicle access.
General HousekeepingForm: (02 )
400466007
9/12/2013
604c.(2).O. Loadlines: All loadlines shall be bullplugged or capped.
General HousekeepingForm: (02 )
400466007
9/12/2013
604c.(2).P. Removal of Surface Trash: A commercial size trash bin for removing debris will be located on site. This bin will be for use by all parties affiliated with the operation.
General HousekeepingForm: (02 )
400466007
9/12/2013
604c.(2).V. Development From Existing Well Pads: KMG is developing multiple reservoirs on the existing Yoxall Farms 10 well pad.
Storm Water/Erosion ControlForm: (02 )
400466007
9/12/2013
604c.(2).W. Site-specific Measures: KMG maintains a Stormwater Management Plan that includes each wellsite location that assesses erosion control for each well pad. This plan is updated every fourteen (14) days and after any major weather event.
Material Handling and Spill PreventionForm: (02 )
400466007
9/12/2013
604c.(2).F. Leak Detection Plan: Automation technology will be utilized at this facility. This technology includes the use of fluid level monitoring for the tanks and produced water sumps, high-level shut offs, and electronic sensors to monitor the interstitial space of double-walled produced water sumps. All automation is monitored by Kerr-McGee’s Integrated Operations Center (IOC,) which is manned 24 hours per day, 7 days per week.
Material Handling and Spill PreventionForm: (02 )
400466007
9/12/2013
604c.(2).K. Pit Level Indicators: All mud pits contain pit level monitors with Electronic Drilling Recorders (EDR) KMG uses an Electronic Drilling Recorder (EDR) with pit level monitor(s) and alarm(s) for production rigs. Basic level gages are used on pits utilized for the surface rig.
Material Handling and Spill PreventionForm: (02 )
400466007
9/12/2013
604c.(2).N. Control of Fire Hazards: KMG will ensure that any material that might be deemed a fire hazard will be will remain no less than twenty-five (25) feet from the wellhead(s), tanks and separator(s).
ConstructionForm: (02 )
400466007
9/12/2013
604c.(2).G. Berm Construction: A plastic liner has been laid under the tanks on this location and a metal containment has been constructed. A 6-8” deep ditch has been constructed around the perimeter of the location for additional protection. The stockpiles generated from construction were placed on the southeast edge of the pad between the pad and the existing creek.
ConstructionForm: (02 )
400466007
9/12/2013
604c.(2).M. Fencing Requirements: No fencing was installed on this existing location.
ConstructionForm: (02 )
400466007
9/12/2013
604c.(2).R. Tank Specifications: Condensate storage tanks will be designed, constructed and maintained pursuant to code 30 of the National Fire Protection Association. KMG will maintain written records to verify proper design.
Noise mitigationForm: (02 )
400466007
9/12/2013
604c.(2).A. Noise: A sound mitigation burier (hay bales) has been placed on the northern side of the pad location to damper noise during drilling and completions to the nearby residence and to Weld County Road 6. No additional noise mitigation has been requested during our recent drilling activity.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).B. Closed Loop Drilling System: A closed loop drilling system has been utilized during drilling of the wells recently drilled on this location and will be used for the proposed redrill as well.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).C. Green Completions: Kerr-McGee will install a vapor recovery unit to prevent any uncontrolled venting. Produced oil and gas will be piped off of location to minimize truck exhaust and flaring. Temporary flowback flaring and oxidizing equipment shall be used.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).H. BOPE: Our rigs at a minimum will have a double ram with blind and pipe ram; and annular preventer.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).I. BOPE Testing for Drilling Operations: Upon initial rig-up, BOPE’s will be tested at a minimum of every 30-days.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).J. BOPE for Well Servicing Operations: Blowout prevention equipment will be used on any servicing operations associated with this well. Backup stabbing valves will be used during any future servicing operations during reverse circulation. Valves shall be pressure tested before each well servicing operation using low-pressure air and high-pressure fluid.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).L. Drill Stem Tests: No drill stem tests will be performed without prior approval from the director.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
604c.(2).Q. Guy Line Anchors: Should guy line anchors be left buried for future use, they shall be identified by a bright marker greater than four (4) feet high and no more than one (1) foot east of the guy line anchor.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
Anti-collision: Prior to drilling operations, Operator will perform an anti-collision scan of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision scan will include definitive MWD or gyro surveys of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well will only be drilled if the anti-collision scan results indicate that there is not a risk for collision, or harm to people or the environment.  For the proposed well, upon conclusion of drilling operations, an as-constructed gyro survey will be submitted to COGCC with the Form 5.
Drilling/Completion OperationsForm: (02 )
400466007
9/12/2013
Operator will comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. (attached)
Final ReclamationForm: (02 )
400466007
9/12/2013
604c.(2).T. Well Site Cleared: The wellsite will be cleared of all non-essential equipment within ninety (90) days after all wells associated with the pad have been plugged and abandoned.
Final ReclamationForm: (02 )
400466007
9/12/2013
604c.(2).U. Identification of Plugged and Abandoned Wells: Pursuant to rule 319.a.(5)., once the well has been plugged and abandoned, KMG will identify the location of the wellbore with a permanent monument that will detail the well name and date of plugging