WELL05-123-37987Razor Federal
26L-2304B
FUNDARE RESOURCES OPERATING COMPANY LLC
10773
PR
11/26/2014
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NWSW 26 10N58W 6
434157View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400465757
8/29/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
Reclamation SpecialistForm: (04 )
401014855
4/22/2016
Approval/passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the Notice. It is not an acknowledgement that the reclamation has been passed. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
Reclamation SpecialistForm: (04 )
401018178
4/22/2016
Approval/passing of the form 4 acknowledges that the Oil and Gas Conservation Commission has received the Notice. It is not an acknowledgement that the reclamation has been passed. A field inspection will be conducted at a future date to evaluate compliance with reclamation standards.
Reclamation SpecialistForm: (04 )
401018178
4/22/2016
Enough topsoil will be saved and stockpiled to cover final reclamation of the location.
Reclamation SpecialistForm: (04 )
401018178
4/22/2016
Mechanical treatment will be used for weed management until desirable perennial vegetation has become established. At that point weed management through the use of chemical treatments may be incorporated.
Reclamation SpecialistForm: (04 )
401018178
4/22/2016
Unless operator has (and can provide) evidence of reclamation success through the use of Cornstalk as a mulch type, straw mulch shall be used.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400465757
9/12/2013
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed.
Material Handling and Spill PreventionForm: (02 )
400465757
9/12/2013
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.
Drilling/Completion OperationsForm: (02 )
400465757
9/12/2013
The casing will be driven. The Razor 23-2612H is the only well permitted within 1500 feet. The well location was not built or drilled. The location will be abandoned via Sundry Notice. Wells Planned within 1500 feet are shown on the multi-well plan map.
Storm Water/Erosion ControlForm: (04 )
401014855
4/22/2016
Stormwater erosion mitigated as per document number 682500471.
Storm Water/Erosion ControlForm: (04 )
401014855
4/22/2016
Sediment was removed from around the wattles and the perimeter berm.