Engineer | Form: (02 ) 400429243 6/27/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Environmental Data | Form: (04 ) 400512012 11/26/2013 | A review of DWR data on the COGCC website indicates that there are no available water sources within ½ mile of the proposed oil and gas well(s). |