| Engineer | Form: (02) 400404170 05/02/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara whichever is shallower. Verify coverage with cement bond log.
3) If dry hole, set 40 sk cement 50’ above Lyons, 40 sk cement 50’ above J-Sand, 40 sk cement 50’ above Niobrara, 40 sks cement across any DST w/ show, 50 sks cement from 50’ below to 50’ above surface casing shoe, 15 sks cement top of surface casing, cut 4’ below GL, weld on plate, or set dry hole marker, 5 sks cement in rat hole & 5 sks cement in mouse hole.
|
| Engineer | Form: (04) 400654422 08/06/2014 | 1) Injection is not authorized until approval of Forms 31 and 33. Forms 31 and 33 are required. |
| UIC | Form: (04) 400654422 08/07/2014 | Operator will not be allowed to inject into the Precambrian "Granite Wash" interval until they have convinced COGCC that the potential for induced seismicity is low. Ultimately COGCC may require this interval to be abandoned by plug back prior to initial injection. In addition to the standard documentation required for Forms 31 and 33 (listed below) Whiting may be required to provide local seismic data and/or a spinner survey in the well(s) as part of the justification of low potential for induced seismicity. |
| UIC | Form: (04) 400654422 08/08/2014 | Injectivity tests are limited to total of 10,000 bbls and 10 days. |
| UIC | Form: (04) 401365782 08/10/2017 | Approval is given for a temporary increase in the daily injection rate at the Wildhorse 16-13L from 15,000 barrels per day (approved in Sundry # 401004873) to 17,500 barrels per day through October 31, 2017. The daily rate must drop back down to 15,000 barrels per day after October 31, 2017. |
| UIC | Form: (04) 401461550 11/27/2017 | Operator shall return well to permitted daily injection rate of 15,000 bpd (barrels per day) from increased rate of 17,500 bpd per previous agreement. See Sundry 401365782. |
| Engineer | Form: (04) 403575069 02/01/2024 | Results of all mechanical integrity tests to be submitted on Form 21, Mechanical Integrity Test, within 30 days after the test |