| Engineer | Form: (02) 400393566 04/11/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per 317.o.
|
| Permit | Form: (02) 400393566 04/15/2013 | Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
|
| Engineer | Form: (04) 403976583 10/31/2024 | At the conclusion of twelve months (03/27/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 403976583 10/31/2024 | Shut in Bradenhead pressure shall not exceed 50 psig. |
| Engineer | Form: (04) 404323079 08/20/2025 | At the conclusion of twelve months (03/03/2026), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 404323079 08/20/2025 | Shut in Bradenhead pressure shall not exceed 50 psig. |