COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400360886
01/15/2013
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per 317.o.
PermitForm: (02)
400360886
03/14/2013
Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
PermitForm: (04)
400570745
03/25/2014
Operator shall comply with Buffer Zone Move-In, Rig-Up Notice Policy dated 12-16-2013.
PermitForm: (04)
400570745
03/25/2014
Open hole resistivity and gamma logs shall be run to describe the stratigraphy of the entire wellbore and to adequately verify the setting depth of surface casing and aquifer coverage. On a multi-well pad, these open hole logs are only required on one of the first wells drilled on the pad and the Drilling Completion Report - Form 5 for every well on the pad shall identify which well was logged.
PermitForm: (04)
400570745
03/25/2014
Operator must comply with COGCC Policy for Bradenhead Monitoring During Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
EngineerForm: (04)
400570745
04/18/2014
Operator acknowledges the proximity of the listed non-operated wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted, and submit Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. Kissler-Amen et al 1-25 (API 123-11462) Monfort 34-25 (API 123-11680)
EngineerForm: (04)
400570745
04/18/2014
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04)
402366645
04/22/2020
1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples. 3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months. 4. At the conclusion of the six months, conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
402366645
04/22/2020
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
403198529
10/19/2022
1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples. 3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months. 4. At the conclusion of the six months (02/18/2023), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
403198529
10/19/2022
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
403320182
02/22/2023
1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare. 2. Prior to starting Bradenhead mitigation, if a sample has not been collected within the last twelve months collect Bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples. 3. During the first day of mitigation operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the Bradenhead. During the shut-in period record pressure data to adequately characterize the build-up. This mitigation plan may be used for six consecutive months. 4. At the conclusion of the six months (8/07/2023), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
403320182
02/22/2023
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
403484130
08/30/2023
At the conclusion of the six months (3/02/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
403484130
08/30/2023
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
403701786
03/11/2024
At the conclusion of the six months (8/05/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
403701786
03/11/2024
Shut in Bradenhead pressure shall not exceed 50 psig.
OGLAForm: (04)
403801753
05/29/2024
Due to proximity to a mapped wetland, surface water and expected shallow groundwater, operator will use secondary containment for all tanks and other liquid containers. Operator will implement stormwater BMPs and erosion control measures as needed to prevent sediment and stormwater runoff from entering the wetland and surface water. 
EngineerForm: (04)
403876666
08/06/2024
At the conclusion of the six months (12/12/2024), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
403876666
08/06/2024
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
404020477
12/23/2024
At the conclusion of twelve months (11/18/2025), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
404020477
12/23/2024
Shut in Bradenhead pressure shall not exceed 50 psig.
EngineerForm: (04)
404438183
11/25/2025
At the conclusion of twelve months (11/03/2026), conduct a new Bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data.
EngineerForm: (04)
404438183
11/25/2025
Shut in Bradenhead pressure shall not exceed 50 psig.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
PlanningForm: (04 )
403801753
5/29/2024
Lights: Operator will conduct operations during daylight hours only.
Community Outreach and NotificationForm: (04 )
403801753
5/29/2024
Prior to commencing operations, the Operator will provide an informational sheet to the owners/occupants of RBUs nearby and adjacent to the parcel on which the well is located. The sheet will include the Operator's contact information and the nature, timing, and expected duration of the operations
WildlifeForm: (04 )
403801753
5/29/2024
Operations are currently scheduled to occur outside the bald eagle roost season (Nov 15 - Mar 15). If operations cannot be completed outside the roost season, at least two non-consecutive roost surveys (one AM and one PM), separated by approx. one week, will be conducted: if no roosting is observed, work will proceed as normal; if roosting is observed within 1/2 mile, operations will be limited to two hours post-sunrise to two hours pre-sunset. Operations will not extend into the river channel.
Noise mitigationForm: (04 )
403801753
5/29/2024
Operator will comply with maximum permissible noise levels pursuant to Rule 423 and will install temporary sound walls, straw bales, or other BMPs to aid in sound attenuation if necessary.
Odor mitigationForm: (04 )
403801753
5/29/2024
Nuisance odors are not anticipated for this Operation, however, will be monitored and treated, as necessary. Daily Operation summaries will document to ensure all BMP’s and COA’s are met.