| Engineer | Form: (02) 400375429 02/20/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara. Verify cement coverage with a cement bond log per 317.o.
|
| Engineer | Form: (02) 400375429 02/20/2013 | Operator previously acknowledged the proximity of the UPRR 22 Pan AM D #1 (API# 123-07301) well. Operator agrees to: provide one of the five mitigation options (per the Horizontal Offset Policy – Draft) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic fracture treatment of this well. |
| Engineer | Form: (02) 400375429 02/20/2013 | Operator previously acknowledged the proximity of the Raith L #15-3 (API# 123-09832) well. Operator agrees to: provide one of the five mitigation options (per the Horizontal Offset Policy – Draft) to mitigate the situation, ensure all applicable documentation is submitted based on the selected mitigation option chosen, and submit a Form 42 (“OTHER – AS SPECIFIED BY PERMIT CONDITION”) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic fracture treatment of this well. |
| Permit | Form: (04) 400754899 01/02/2015 | FIELD INSPECTION WILL BE CONDUCTED TO DETERMINE SITE STATUS
|