Engineer | Form: (02 ) 400376208 2/19/2013 | 1) Provide 48 hour notice of spud via electronic Form 42.
2) Set at least 900’ of surface casing. Cement to surface.
3) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (06 ) 401420547 10/6/2017 | Note changes to submitted form.
1) Provide 48 hour notice of MIRU via electronic Form 42.
2) Shoe plug: Tag plug 50’ above surface casing shoe, if not circulated to surface.
3) Surface plug: Cement from 50' to surface in casing and annulus.
4) Properly abandon flowlines per Rule 1103. File Form 42 when done.
|
Engineer | Form: (06 ) 401420547 10/6/2017 | Bradenhead:
Prior to starting plugging operations a bradenhead test shall be performed.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
The Form 17 shall be submitted within 10 days of the test.
|
Permit | Form: (06 ) 401420547 10/9/2017 | Returned to draft. Niobrara interval does not match the 5A. |