WELL05-123-36928HOWARD
27N-28HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
3/1/2023
WATTENBERG
90750
WELD  123
NENE 28 1N67W 6
318894View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400373999
2/12/2013
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage from the 7” casing TD to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with a cement bond log.
PermitForm: (02 )
400373999
2/12/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (04 )
402617408
3/8/2021
Operator shall continue to monitor pressure, and report to COGCC through annual testing. If monitored well conditions meet the thresholds defined by Order 1-232 a new bradenhead sundry must be filed.
OGLAForm: (04 )
403018443
4/20/2022
Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well repair and / or test operations with a workover rig or other heavy equipment do not constitute a nuisance or hazard to public health, welfare and the environment. Due to proximity of building units (BUs) all blowdown gases will be controlled.
OGLAForm: (04 )
403018443
4/20/2022
Prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners/occupants of BUs that are nearby and adjacent to the parcel on which the well is located. The sheet will include the operator's contact information and the nature, timing, and expected duration of the well repair and / or test operations with a workover rig or other heavy equipment.
OGLAForm: (04 )
403018443
4/20/2022
This oil and gas location is located within a CPW-mapped 500 foot buffer of the Ordinary High Water Mark of Big Dry Creek for protection of Aquatic Native Species Conservation Water High Priority Habitat. At a minimum, operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water.
EngineerForm: (04 )
403018443
5/4/2022
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations. 2) The additional cement referenced shall be placed as indicated. The placed cement shall be verified with a cement bond log. 3) Operator will successfully pressure test the production casing repair for a minimum of 15 minutes and to a minimum of 300psi. 4) Pressure test and cement bond log to be submitted with a Form 5 within 30 days of repair operations.
EngineerForm: (04 )
403018443
5/4/2022
Operator will avoid initiating hydraulic fractures in or above groundwater zones.
OGLAForm: (04 )
403229667
1/3/2023
Operator will inform Building Unit owners and tenants within 2,000 feet of the Working Pad Surface of the MIRU per Rule 412.b.(5).
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400373999
2/28/2013
Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.
Drilling/Completion OperationsForm: (02 )
400373999
2/28/2013
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.
Community Outreach and NotificationForm: (04 )
403018443
5/4/2022
Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations. Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard
PlanningForm: (04 )
403229667
1/3/2023
Operations are daylight-only; no lighting impacts are anticipated from operations.
Community Outreach and NotificationForm: (04 )
403229667
1/3/2023
Courtesy notifications will be sent to all parcel owners with building units within 1,500 feet of the location letting them know about our subsequent well operations and providing contact information for Kerr McGee’s response line and online resources.
Community Outreach and NotificationForm: (04 )
403229667
1/3/2023
Signs will be placed in conspicuous locations and will include Oxy contact information; the Oxy Stakeholder Relations team will respond to all community member inquiries. The signs will be placed so as not to create a potential traffic hazard
WildlifeForm: (04 )
403229667
1/3/2023
This planned location is located within a native aquatic species buffer. KMOG will implement stormwater BMPs (Including the use of straw wattle) during operations to prevent sediment from leaving the location.
Dust controlForm: (04 )
403229667
1/3/2023
Water will be placed on dirt access roads to mitigate dust as needed.
Noise mitigationForm: (04 )
403229667
1/3/2023
Operations will be in compliance with Table 423-1 requirements. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units.