| Engineer | Form: (02) 400352552 01/24/2013 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 402045218 04/12/2022 | For combustion of gas due to upset conditions, criteria set forth by 903.d.(1) limiting the duration and requiring records being kept of those instances where combustion was necessary must be followed after January 15, 2021. |