Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-36703Buchner
2-2H
STRACHAN EXPLORATION INC
83130
PR
12/1/2025
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NWSW 2 7N60W 6
431634View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400352552
01/24/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04)
402045218
04/12/2022
For combustion of gas due to upset conditions, criteria set forth by 903.d.(1) limiting the duration and requiring records being kept of those instances where combustion was necessary must be followed after January 15, 2021.
 
COGIS - Best Management Practice Results
No records to display.