WELL05-123-36689CANNON
35N-10HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
8/1/2023
WATTENBERG
90750
WELD  123
NWNW 10 2N66W 6
431592View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400365499
01/15/2013
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify cement coverage with a cement bond log per 317.o.
EngineerForm: (02)
400365499
01/15/2013
Per the attached correspondence (doc# 2482110), Robert L. McPeek Unit #1 (API# 123-07986) and Robert L. McPeek Unit #3 (API# 123-10485) will either be remediated to provide adequate formation isolation or plugged and abandoned. Both a Form 4 Sundry Notice detailing the required remediation and a Form 5 Drilling Completion Report describing the work done must be submitted and approved for the referenced wells prior to the hydraulic fracture treatment of this well, if they are to be remediated. Otherwise, both a Form 6 NOI outlining the plugging procedures and a Form 6 SRA describing the work done must be submitted and approved for the referenced well prior to the hydraulic fracture treatment of this well, if they are to be plugged and abandoned. At the operator’s discretion, both remediation and plugging are acceptable, as long as the referenced wells have adequate documented formation isolation prior to the stimulation of this well.
PermitForm: (02)
400365499
01/17/2013
Operator must meet water well testing requirements per Rule 318A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400365499
1/31/2013
“Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.”
Drilling/Completion OperationsForm: (02 )
400365499
1/31/2013
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.