Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-36647Horsetail
07-0611H
FUNDARE RESOURCES OPERATING COMPANY LLC
10773
PR
10/27/2017
DJ HORIZONTAL NIOBRARA
16950
WELD  123
LOT2 7 10N57W 6
431527View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400359235
01/02/2013
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Provide cement coverage to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. 4) Operator shall exclude the segment of the proposed wellbore (horizontal) within 500’ of the existing well from the hydraulic fracture treatment. The well of concern is the [Beffie #1, 123-05789]. 5) After the proposed well has been drilled to TD, the operator shall submit a Sundry Notice Form 4 detailing the treatment plan and the segment of the borehole to be excluded from the treatment. a. Sundry Notice shall be submitted at least ten (10) days prior to the hydraulic fracture treatment. b. Required attachment: Directional survey c. Required information: Specific details of wellbore segment being excluded from treatment. d. Sundry Notice shall be submitted via email to the appropriate engineer and engineering supervisor. e. Sundry Notice approval is required prior to hydraulic fracture treatment. 6) Operator shall clearly report wellbore segment excluded from treatment on Form 5A.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
400359235
1/31/2013
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with oil and gas operations throughout the State of Colorado. • Materials and fluids will be stored in a neat and orderly fashion. • Waste will be collected regularly and disposed of at an offsite facility. • Prompt cleanup is required of spills to minimize waste materials entering the stormwater runoff. • Drip pans will be used during fueling and maintenance to contain spills or leaks. • Cleanup of trash and discarded material will be done at the end of the work day. • Cleanup will consist of monitoring the road, location and any other work areas. • Material to be cleaned up includes trash, scrap, and contaminated soil.
PlanningForm: (02 )
400359235
1/31/2013
The Operator participates in the Colorado Oil & Gas Association Voluntary Baseline Groundwater Sampling Program.
Storm Water/Erosion ControlForm: (02 )
400359235
1/31/2013
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with oil and gas development throughout the State of Colorado. BMPs will be constructed as necessary to prevent stormwater from leaving the construction site. BMPs used will vary according to the location, and will remain until the pad is reclaimed.