WELL05-123-36635GRIFFITHS AL
35C-20HZ
KERR MCGEE OIL & GAS ONSHORE LP
47120
AL
1/2/2015
WATTENBERG
90750
DACONO/WELD  123
NWNW 17 1N67W 6
431507View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400360181
1/11/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02 )
400360181
1/24/2013
1) Note surface casing setting depth change from 900’ to 1050’. Increase cement coverage accordingly and cement to surface. 2) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 3) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with cement bond log. 4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
PermitForm: (04 )
400752277
1/2/2015
FIELD INSPECTION WILL BE CONDUCTED TO DETERMINE SITE STATUS
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400360181
1/31/2013
“Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.” At the time of permitting; the operator has identified the following well(s) as being within close proximity of the proposed well: GRIFFITHS 35C-20HZ: - UPRR 42 PAN AM N/NAV
Drilling/Completion OperationsForm: (02 )
400360181
1/31/2013
Kerr McGee acknowledges the proximity of Kerr McGee’s wells UPRR 42 PAN AM N/NAV 1(05-123-08105) and MARGUERITE TOTEMS UNIT 1 (05-123-07900 ) to Kerr McGee’s proposed Griffiths wells, Kerr McGee shall undertake necessary mitigation measures to prevent groundwater contamination from the above identified offset wells in the drilling and completion of proposed well.
Drilling/Completion OperationsForm: (02 )
400360181
1/31/2013
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.