| Material Handling and Spill Prevention | Form: (02 ) 400354541 1/11/2013 | Operator will ensure 110 percent secondary containment for any volume of fluids
contained at the well site during drilling and completion. Operator will implement best
management practices to contain any unintentional release of fluids. |
| Site Specific | Form: (02 ) 400354541 1/11/2013 | Fresh water for the Fresh Water Storage Pit comes from water provider; water sources
permitted for consumable industrial use. |
| Material Handling and Spill Prevention | Form: (02 ) 400354541 1/11/2013 | Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond. |
| Storm Water/Erosion Control | Form: (02 ) 400354541 1/11/2013 | Operator has designed the well pad with insloping and a storm water control ditch to
prevent storm water run-on/runoff and the release of fluids from the location. See
attached Construction Layout Drawing. |
| Site Specific | Form: (02 ) 400354541 1/11/2013 | Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use
of the pit for any fluid that does not come from municipal, irrigation or surface water
source. |
| Construction | Form: (02 ) 400354541 1/11/2013 | The location will be fenced and the fenced area will include the Fresh Water Storage
Pit. |
| Pre-Construction | Form: (02 ) 400354541 1/11/2013 | The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage
Pit. |
| Planning | Form: (02 ) 400354541 1/11/2013 | A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water
storage pit. |
| Site Specific | Form: (02 ) 400354541 1/11/2013 | Operator will participate in the Colorado Oil & Gas Association Voluntary Baseline
Groundwater Quality Sampling Program.
Operator will implement interim reclamation measures immediately after construction of
the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles,
establish desirable vegetation and control weeds on the location. |