TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400344070
12/18/2012
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from end of 7” casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04 )
400789324
4/10/2015
Operator acknowledges the proximity of the listed wells. Operator agrees to provide mitigation Option 1 or 2 (per the DJ Basin Horizontal Offset Policy), ensure all applicable documentation is submitted , and submit a Form 42(s) (“OFFSET MITIGATION COMPLETED”) for the remediated wells, referencing the API Number of the proposed horizontal well(s) stating what appropriate mitigation occurred and that it has been completed, prior to the hydraulic stimulation of this well. VC LeClerg Gas Unit #1 (API 123-08392)
EngineerForm: (04 )
400928990
11/4/2015
Use of oil-based mud approved only for drilling below cemented surface casing.
EngineerForm: (04 )
403857736
7/24/2024
1) Provide electronic Form 42-Other ("Treatment") two business days ahead of operations. 2) During treatment operations, the operator will continuously monitor the surface and casing pressures of the wellbore being treated. If there is any reason to suspect a potential downhole failure during treatment operations, stop treatment and contact ECMC engineering. 3) The Operator will submit the Form 5A, Completed Interval Report within 30 days after the treatment operations
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400344070
12/28/2012
“Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.” At the time of permitting; the operator has identified the following well(s) as being within close proximity of the proposed well: McKINSTRY 21N-21HZ: - V C LECLERG GAS UNIT 1
Drilling/Completion OperationsForm: (02 )
400344070
12/28/2012
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.