| Permit | Form: (02) 400343680 11/14/2012 | Operator must meet water well testing requirements per Rule 318A.
|
| Engineer | Form: (02) 400343680 11/26/2012 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) If dry hole: a) with production liner installed: set 100’ cement or CIBP w/ 2 sx cement in liner or casing 50’ above top of Niobara. b) without production liner: set 40 sks cement in intermediate casing 50’ above Niobrara top. With either a) or b) above: set 40 sx cement at the stub if recovering intermediate casing, then set 50 sks cement ½ out, ½ in surface casing, 10 sks cement top of surface casing, cut 4’ below ground level, weld on plate, 5 sks cement in rat hole & 5 sks cement in mouse hole.
4) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| OGLA | Form: (06) 404140313 04/11/2025 | Operator provided COAs:
Operator will use secondary containment for all tanks and other liquid containment. |
| OGLA | Form: (06) 404140313 04/11/2025 | Due to proximity to mapped surface water, Operator will review the stormwater program and implement stormwater BMPs and erosion control measures as needed to prevent fine-grained sediment and impacted stormwater runoff from entering surface water. |
| Engineer | Form: (06) 404140313 04/17/2025 | Plugging
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.
2) Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from ECMC is obtained.
3) The wellbore must be static prior to placing cement plugs which are to be a minimum of 100' in length for all but surface plugs. Mechanical isolation requires a 25' cement plug (minimum) on top. For plugs not specified to be tagged, a tag is required if circulation is not maintained while pumping plug and displacing to depth. Wait on cement(WOC) a minimum of 4 hrs before tagging a plug. Tag at tops specified. Notify ECMC Area Engineer of a high(shallow) tag or before adding cement to a previous plug due to a low(deep) cement top.
4) Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. Surface plugs shall be circulated to surface. Confirm cement to surface and complete isolation in all strings during cut and cap. After cut and prior to cap, verify isolation by either a 15 minute bubble test or 15 minute optical gas imaging observation. If there is indication of flow contact ECMC Engineering. Provide a statement on the 6SRA which method was used and what was observed. Retain records of final isolation test for 5 years.
5) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed.
6) Operator must wait a sufficient time on all plugs to achieve the intended design. If at any time during the plugging there is evidence of previously unreported pressure or fluid migration, contact ECMC Area Engineer before continuing operations.
7) Plugging procedure has been modified as follows,
Plug #1 - 6050', CIBP with 25 sx of cement on top,
Plug #2 - 1490-1290', 40 sx cement casing plug, NOTE: CHANGE OF DEPPTH
Plug #3 - 532-0', perf and circulate 180 sx of cement to the surface, WOC and tag if cement does not remain at the surface,
Plug #4 - 50' of cement at the surface per COA #4, 20 sx in 9 5/8"" surface casing, if needed.
|
| Engineer | Form: (06) 404140313 04/17/2025 | Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
|
| Engineer | Form: (06) 404140313 04/17/2025 | Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
|
| Engineer | Form: (06) 404140313 04/17/2025 | Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public welfare.
|
| Engineer | Form: (06) 404140313 04/17/2025 | Bradenhead Testing
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples.
If there is a need for sampling, contact ECMC engineering for verification of plugging procedure.
|