WELL05-123-36384GITTLEIN
30N-28HZXX
KERR MCGEE OIL & GAS ONSHORE LP
47120
PR
10/1/2025
WATTENBERG
90750
WELD  123
SWSW 33 2N65W 6
430956View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02)
400338903
11/09/2012
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02)
400338903
11/14/2012
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage from the 7” casing TD to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
EngineerForm: (02)
400338903
11/14/2012
Per the attached Correspondence (Doc# 2481942), Kerr-McGee agrees to plug and abandon both the Gittlein # 1 (API# 123-07903) and Gittlein # 2 (API# 123-10646) wells and remediate the Mary Arndt #1 (API# 123-08198). For the wells to be plugged, both a Form 6 Notice of Intent to Abandon outlining the plugging procedures and a Form 6 Subsequent Report of Abandonement describing the work done must be submitted and approved. For the Mary Arndt #1, both a Form 4 Sundry notice outlining the proposed remediation and a Form 5 Drilling Completion Report describing the work done must be submitted and approved. In general plugs and remedial cement shall be provided to adequately isolate all producing formations penetrated from one another. Both the two Form 6 SRAs and Form 5 must be approved prior to the hydraulic fracture treatment of this well.
EngineerForm: (02)
400497395
10/29/2013
1) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 2) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02)
400492513
10/29/2013
1) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 2) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400338903
12/3/2012
“Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.”
Drilling/Completion OperationsForm: (02 )
400338903
12/3/2012
Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012.