Permit | Form: (02 ) 2288418 5/15/2012 | Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
|
Engineer | Form: (02 ) 2288418 5/23/2012 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
3)Comply with Rule 321. Run and submit Directional Survey from the TD to surface. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|