| Drilling/Completion Operations | Form: (02 ) 400315939 10/30/2012 | “Prior to drilling operations, Operator may perform an anti-collision review of existing offset wells that have the potential of being within close proximity of the proposed well. This anti-collision review may include MWD or gyro surveys and surface locations of the offset wells with included error of uncertainty per survey instrument, and compared against the proposed wellpath with its respective error of uncertainty. If current surveys do not exist for the offset wells, Operator may have gyro surveys conducted to verify bottomhole location. The proposed well may only be drilled if the anti-collision review results indicate that the risk of collision is sufficiently low as defined by the anti-collision plan, with separation factors greater than 1.5, or if the risk of collision has been mitigated through other means including shutting in wells, plugging wells, increased drilling fluid in the event of lost returns or as is appropriate for the specific situation. In the event of an increased risk of collision, that risk will be mitigated to prevent harm to people, the environment or property. For the proposed well, upon conclusion of drilling operations, an as-constructed directional survey will be submitted to COGCC with the Form 5.”
At the time of permitting; the operator has identified the following well(s) as being within close proximity of the proposed well:
SPARBOE 1N-26HZ:
- SPARBOE 9-35A |
| Drilling/Completion Operations | Form: (02 ) 400315939 10/30/2012 | Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area dated May 29, 2012. |
| Drilling/Completion Operations | Form: (02 ) 400387238 3/15/2013 | “Prior to drilling operations, Operator may perform an anti-collision review of existing
offset wells that have the potential of being within close proximity of the proposed well.
This anti-collision review may include MWD or gyro surveys and surface locations of the
offset wells with included error of uncertainty per survey instrument, and compared
against the proposed wellpath with its respective error of uncertainty. If current surveys
do not exist for the offset wells, Operator may have gyro surveys conducted to verify
bottomhole location. The proposed well may only be drilled if the anti-collision review
results indicate that the risk of collision is sufficiently low as defined by the anti-collision
plan, with separation factors greater than 1.5, or if the risk of collision has been
mitigated through other means including shutting in wells, plugging wells, increased
drilling fluid in the event of lost returns or as is appropriate for the specific situation. In
the event of an increased risk of collision, that risk will be mitigated to prevent harm to
people, the environment or property. For the proposed well, upon conclusion of drilling
operations, an as-constructed directional survey will be submitted to COGCC with the
Form 5.”
At the time of permitting; the operator has identified the following well(s) as being within
close proximity of the proposed well:
SPARBOE 1N-26HZ:
- SPARBOE 9-35A |
| Drilling/Completion Operations | Form: (02 ) 400387238 3/15/2013 | Kerr McGee acknowledges and will comply with the COGCC Policy for Bradenhead
Monitoring during Hydraulic Fracturing Treatments in the Greater Wattenberg Area
dated May 29, 2012. |