| Planning | Form: (02 ) 400327295 10/30/2012 | The Pit Report on Form 15 will be submitted within 30 days of construction of the fresh water storage pit. |
| Drilling/Completion Operations | Form: (02 ) 400327295 10/30/2012 | Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during
drilling and completion. Operator will implement best management practices to contain any unintentional release of
fluids.
Fresh water for the Fresh Water Storage Pit comes from a water provider; water sources permitted for consumable
industrial use. |
| Construction | Form: (02 ) 400327295 10/30/2012 | Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/run-off and the release of fluids for the location. See attached Construction Layout Drawing.
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
The COGCC will be notified 48 hours prior to construction of the Fresh Water Storage Pit. |