COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400308908
8/16/2012
1) Provide 48 hour notice prior to spud via electronic Form 42. 2) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
400308908
8/29/2012
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400308908
8/29/2012
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400308908
8/29/2012
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400308908
8/29/2012
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02 )
400308908
8/29/2012
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400308908
8/29/2012
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400308908
8/29/2012
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02 )
400308908
8/29/2012
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Material Handling and Spill PreventionForm: (02 )
400328047
9/20/2012
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400328047
9/20/2012
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400328047
9/20/2012
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400328047
9/20/2012
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02 )
400328047
9/20/2012
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400328047
9/20/2012
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400328047
9/20/2012
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02 )
400328047
9/20/2012
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Site SpecificForm: (02 )
400328047
9/20/2012
Operator will participate in the Colorado Oil & Gas Association Voluntary Baseline Groundwater Quality Sampling Program. Operator will implement interim reclamation measures immediately after construction of the location to stabilize cut and fill slopes, stabilize the topsoil and spoil stockpiles, establish desirable vegetation and control weeds on the location.