COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02)
400287862
07/18/2012
Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
EngineerForm: (02)
400287862
07/30/2012
1)Provide notice of MIRU via an electronic Form 42. 2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
EngineerForm: (04)
402329170
03/23/2020
This approval is good for one year and a new application must be made before March 3, 2021. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402329170
03/23/2020
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402329170
03/23/2020
Please update production reporting from May, 2018 to present to reflect TA status and not AB.
EngineerForm: (04)
402606337
02/23/2021
This approval is good for one year and a new application must be made before February 22, 2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402606337
02/23/2021
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402918808
01/06/2022
This approval is good for one year and a new application must be made before January 6, 2023. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402918808
01/06/2022
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402918808
01/06/2022
Update production reporting for May 1, 2020 to reflect TA status and not AB.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400287862
8/21/2012
Great Western Oil & Gas Company, LLC - Best Management Practices - Summary Storm water management Plans (SWMP) will be in place to address construction, drilling and operations associated with Oil and Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health (CDPHE). BMP’s will be constructed around the perimeter of the site prior to or at the beginning of construction; BMP’s used will vary according to the location, and will remain in place until the pad reaches final reclamation. Spill Prevention Control and Counter Measures (SPCC) plans will be in place to address any possible spills associated with Oil and Gas operations throughout the state of Colorado in accordance with CFR 112. In accordance with COGCC Rule 1002.f.(2)A. & B., shall provide a designated storage area for dry bulk chemicals and miscellaneous fluids. The storage area shall be covered to prevent contact of precipitation with chemicals, shall be elevated above storm- or standing water, and shall provide sufficient containment to prevent release of spilled fluids or chemicals from impacting soil, surface water or groundwater and will prevent the co-mingling of spilled fluids or chemicals with other E & P Waste. Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with storm water runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling, There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup will consist of patrolling the roadways, access areas, and other work areas to pick up trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly and promptly.