| Permit | Form: (02) 400303296 07/12/2012 | Operator must meet water well sampling requirements as per Rule 318A. |
| Engineer | Form: (02) 400303296 08/01/2012 | 1) Provide 48 hour notice prior to spud via electronic Form 42.
2) Provide cement coverage from base of intermediate casing (7” casing) to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Engineer | Form: (04) 404059907 02/28/2025 | Alternative MIT is granted for a period ending 3/31/2026. If not returned to production by 3/31/2026 operator shall perform an MIT.
Due to the removal of surface facilities and sales lines, this well is considered Temporarily Abandoned. All other temporary abandonment requirements remain in place including a TA sundry, a 5A, and Form 7 reporting. Furthermore, all Inactive well requirements remain in full effect. |
| Engineer | Form: (04) 404145954 04/11/2025 | 1) Well last produced November 2024, and has been designated as Inactive. Within 6 months of a Well becoming Inactive action must be taken. No later than November 2025, this well must:
A. Be plugged and Abandoned,
B. Return to production so that it is no longer an Inactive Well,
C. Have an approved Form 5B, Inactive Well Notice,
D. Be designated as Out of Service by submitting a Form 6A, Out of Service Designation.
|