| Permit | Form: (02) 400196912 12/08/2011 | Operator must meet water well sampling requirements per rule 318A. |
| Engineer | Form: (02) 400196912 12/12/2011 | 1)Note surface casing setting depth change from 400’ to 700’. Increase cement coverage accordingly and cement to surface.
2)Provide 24 hour notice of MIRU to John Montoya via email at john.montoya@state.co.us.
3)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara and from 200’ below Sussex to 200’ above Sussex. Verify coverage with a cement bond log.
4)Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|