| Drilling/Completion Operations | Form: (02 ) 400248960 4/2/2012 | Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unitentional release of fluids.
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Fresh Water Storage Pit shall contain fresh water only and sipage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source. |
| Planning | Form: (02 ) 400248960 4/2/2012 | Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit. |
| Construction | Form: (02 ) 400248960 4/2/2012 | Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-off/run-on and the release of fluids from the location. See attached Construction Layout Drawing.
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
The COGCC to be notified 48 hours prior to consturction of the Fresh Water Storage Pit.
|
| Construction | Form: (02 ) 400249070 4/2/2012 | Operator has designed the well pad with insloping and a storm water control ditch to prevent strom water run-off/run-on and the release of fluids form the location. See attached Construction Layout Drawing.
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
The COGCC will be notified 48 hours prior to construction of the Fresh Water Storage Pit. |
| Planning | Form: (02 ) 400249070 4/2/2012 | Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit. |
| Drilling/Completion Operations | Form: (02 ) 400249070 4/2/2012 | Operator will ensure 110 percent secondary contaiment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Fresh water for the Fresh Water Storage Pit comes from wter provider; water sources permitted for consumable industrial use. |