Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-35357Ford Family Trust
2H
STRACHAN EXPLORATION INC
83130
PR
10/1/2024
DJ HORIZONTAL NIOBRARA
16950
WELD  123
SWSW 31 7N59W 6
428441View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400248960
03/01/2012
1) Provide 48 hour notice of MIRU to Jim Precup by e-mail at james.precup@state.co.us. Indicate Spud Notice in the subject line and provide the following information: Operator Name, Well Name and Number, API #, Spud Date, Contact Name, Contact Phone #, Email Address. Submit Form 42 electronically after April 1 for spud notice. 2) Plug back pilot hole: Dakota, J-Sand, D-Sand, Codell, Niobrara must be isolated from each other with 100' cement plugs.
EngineerForm: (02)
400249070
03/02/2012
1) Provide 48 hour notice of MIRU to Jim Precup by e-mail at james.precup@state.co.us. Indicate Spud Notice in the subject line and provide the following information: Operator Name, Well Name and Number, API #, Spud Date, Contact Name, Contact Phone #, Email Address. Submit Form 42 electronically after April 1 for spud notice. 2) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400248960
4/2/2012
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unitentional release of fluids. Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use. Fresh Water Storage Pit shall contain fresh water only and sipage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
PlanningForm: (02 )
400248960
4/2/2012
Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
ConstructionForm: (02 )
400248960
4/2/2012
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-off/run-on and the release of fluids from the location. See attached Construction Layout Drawing. The location will be fenced and the fenced area will include the Fresh Water Storage Pit. The COGCC to be notified 48 hours prior to consturction of the Fresh Water Storage Pit.
ConstructionForm: (02 )
400249070
4/2/2012
Operator has designed the well pad with insloping and a storm water control ditch to prevent strom water run-off/run-on and the release of fluids form the location. See attached Construction Layout Drawing. The location will be fenced and the fenced area will include the Fresh Water Storage Pit. The COGCC will be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02 )
400249070
4/2/2012
Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Drilling/Completion OperationsForm: (02 )
400249070
4/2/2012
Operator will ensure 110 percent secondary contaiment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Fresh water for the Fresh Water Storage Pit comes from wter provider; water sources permitted for consumable industrial use.