Permit | Form: (02 ) 400231460 1/27/2012 | Operator must meet water well testing requirements per Rule 318A.
|
Engineer | Form: (02 ) 400231460 2/13/2012 | 1) Note surface casing setting depth change from 500’ to 580’. Increase cement coverage accordingly and cement to surface.
2) Provide 24 hour notice of MIRU to COGCC inspector Jim Precup via e-mail at james.precup@state.co.us Indicate Spud Notice in the subject line and provide the following information: Operator Name, Well Name and Number, API #, Spud Date, Contact Name, Contact Phone #, E-mail Address.
3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Engineer | Form: (02 ) 400340078 2/13/2013 | 1)Provide notice of MIRU via an electronic Form 42.
2)Comply with Rule 317.i and provide cement coverage from the 4.5” casing TD to a minimum of 200' above the Niobrara and from 200’. Verify coverage with a cement bond log.
|
Permit | Form: (02 ) 400340078 2/14/2013 | Operator must meet Water Well Testing requirements as per amended Rule 318Ae(4)
|
Engineer | Form: (02 ) 402080763 5/11/2021 | 1) Submit Form 42 electronically to COGCC 2 business days prior to MIRU (Spud Notice), for the first well/activity on the pad and provide 2 business days spud notice for all subsequent wells drilled on the pad.
2) Comply with Rule 408.j and provide cement coverage from the end of production casing to a minimum of 500' above Niobrara. Verify coverage with cement bond log.
3) Oil-based drilling fluid is to be used only after all aquifers are covered.
|
Engineer | Form: (02 ) 402080763 5/11/2021 | Per COGCC Order 1-232, Bradenhead tests shall be performed according to the following schedule and Form 17 submitted within 10 days of each test:
1) Within 60 days of rig release, prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
2) If a delayed completion, 6 months after rig release and prior to stimulation. If any pressure greater than 200 psi, must contact COGCC engineer prior to stimulation.
3) A post-production test within 60 days after first sales, as reported on the Form 10, Certificate of Clearance.
|
Permit | Form: (02 ) 402080763 5/12/2021 | Operator shall comply with Notice to Operators: Interim Reclamation Procedures for Delayed Operation (dated January 5, 2017). |
Permit | Form: (02 ) 402080763 5/12/2021 | If conductors are preset, operator shall comply with Rule 406.e. |
OGLA | Form: (02 ) 402080763 5/17/2021 | COA: Operator will drill and complete this well within 18 months of approval of this Form 2. If conditions beyond the control of the Operator prevent compliance with this COA, then the Operator will meet with the COGCC Director and Staff no less than 90 days prior to the compliance deadline. At that meeting, Operator will provide a timeline to finish drilling and completion, and the Director will determine if additional Best Management Practices or Conditions of Approval are necessary and reasonable to protect and minimize impacts to public health, safety, welfare, the environment and wildlife resources. |
Engineer | Form: (04 ) 403003677 4/5/2022 | Submit a Form 5 with appropriate attachments, ie cement tickets, operations summary, and CBL, if run with the Form 5 when the Liner installation is completed. |
Engineer | Form: (06 ) 403058871 6/6/2022 | Prior to starting plugging operations a Bradenhead test shall be performed if there has not been a reported Bradenhead test within the 60 days immediately preceding the start of plugging operations.
1) If, before opening the Bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required.
2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required.
The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. |
OGLA | Form: (06 ) 403058871 6/6/2022 | Operator will implement measures to capture, combust, or control emissions to protect health and safety, and to ensure that vapors and odors from well plugging operations do not constitute a nuisance or hazard to public health, welfare and the environment. |
Engineer | Form: (06 ) 403058871 6/6/2022 | 1) Provide 2 business day notice of plugging MIRU via electronic Form 42, and provide 48 hours Notice of Plugging Operations, prior to mobilizing for plugging operations via electronic Form 42. These are 2 separate notifications, required by Rules 408.e and 408.I.
2) After placing the shallowest hydrocarbon isolating plug (2220'), operator must wait a sufficient time to confirm static conditions. If at any time after placing this plug there is evidence of pressure or of fluid migration, contact COGCC engineering before continuing operations.
3) Prior to placing the 2220’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders.
4) After isolation has been verified, pump plug and displace. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at 2019’ or shallower and provide 10 sx plug at the surface.
5) Leave at least 100’ of cement in the wellbore for each plug.
6) Properly abandon flowlines as per Rule 1105. Pursuant to Rule 911.a. Closure of Oil and Gas Facilities, Operator will submit Site Investigation and Remediation Workplans via Form 27 for COGCC prior approval before cutting and capping the plugged well, conducting flowline abandonment, and removing production equipment. Pursuant to Rule 1105.f. Abandonment Verification, within 90 days of an operator completing abandonment requirements for a flowline or crude oil transfer line, an operator must submit a Field Operations Notice, Form 42-Abandonment of Flowlines for on-location flowlines, and a Flowline Report, Form 44, for off-location flowlines or crude oil transfer lines.
7) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. |