COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400187609
10/12/2011
1)Provide 24 hour notice of MIRU to Jim Precup via e-mail at jim.precup@state.co.us. 2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log. 3)Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. 4)At least two weeks prior to spud notice, the centralizer and cementing plans shall be submitted to the COGCC for review on a Form 4, Sundry Notice. 5)At least one well on the pad must have a complete set of open hole logs (Compensated Neutron, Dual Induction, Resistivity, etc.) run from TD to surface and submitted to the COGCC. 6)Four hours prior to running any casing, notification shall be provided to Ryan Hollinshead, COGCC Engineer at 303-894-2100 x5134. 7)Bradenhead pressures shall be taken 6, 12, 24 and 48 hours after cementing production casing and prior to stimulation of the well. Once stimulation is complete, the bradenhead pressure shall be recorded at 24 hours, at 48 hours and at one week post-stimulation. Bradenhead pressures greater than 100 psi must be immediately reported on a Form 17 to the COGCC, sent to the attention of Ryan Hollinshead. 8)All bradenhead pressures shall be monitored with a gauge that has a maximum reading of one thousand pounds per square inch (psi). 9)Circulation prior to cementing shall be done to accepted industry standards.
PermitForm: (02)
400187609
10/18/2011
Water Sampling required. Corrected spacing as per Collin R. Ready to pass pending public comment 11/1/11.
PermitForm: (02)
400455881
09/03/2013
Operator must meet water well testing requirements per Rule 318A.
EngineerForm: (02)
400455881
09/15/2013
1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU. 2) Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. 4) At least two weeks prior to spud notice, the centralizer and cementing plans shall be submitted to the COGCC for review on a Form 4, Sundry Notice. 5) At least one well on the pad must have a complete set of open hole logs (Compensated Neutron, Dual Induction, Resistivity, etc.) run from TD to surface and submitted to the COGCC. 6) Four hours prior to running any casing, notification shall be provided to Mike Hickey, COGCC Engineer at 303-894-2100 x5105. 7) Bradenhead pressures shall be taken 6, 12, 24 and 48 hours after cementing production casing and prior to stimulation of the well. Once stimulation is complete, the bradenhead pressure shall be recorded at 24 hours, at 48 hours and at one week post-stimulation. Bradenhead pressures greater than 100 psi must be immediately reported on a Form 17 to the COGCC, sent to the attention of Mike Hickey. 8) All bradenhead pressures shall be monitored with a gauge that has a maximum reading of one thousand pounds per square inch (psi). 9) Circulation prior to cementing shall be done to accepted industry standards.
EngineerForm: (02)
400859788
06/29/2015
1) Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log. 2) Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. 3) Bradenhead pressures shall be taken 6, 12, 24 and 48 hours after cementing production casing and prior to stimulation of the well. Once stimulation is complete, the bradenhead pressure shall be recorded at 24 hours, at 48 hours and at one week post-stimulation. Bradenhead pressures greater than 100 psi must be immediately reported on a Form 17 to the COGCC, sent to the attention of Steve Jenkins. 4) All bradenhead pressures shall be monitored with a gauge that has a maximum reading of one thousand pounds per square inch (psi). 5) Circulation prior to cementing shall be done to accepted industry standards.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400187609
11/1/2011
A closed loop system will be used for drilling fluids.
Drilling/Completion OperationsForm: (02 )
400455881
10/22/2013
A closed loop system will be used for drilling fluids.