| Engineer | Form: (02) 400187457 10/12/2011 | 1)Provide 24 hour notice of MIRU to Jim Precup via e-mail at jim.precup@state.co.us.
2)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
3)Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
4)At least two weeks prior to spud notice, the centralizer and cementing plans shall be submitted to the COGCC for review on a Form 4, Sundry Notice.
5)At least one well on the pad must have a complete set of open hole logs (Compensated Neutron, Dual Induction, Resistivity, etc.) run from TD to surface and submitted to the COGCC.
6)Four hours prior to running any casing, notification shall be provided to Ryan Hollinshead, COGCC Engineer at 303-894-2100 x5134.
7)Bradenhead pressures shall be taken 6, 12, 24 and 48 hours after cementing production casing and prior to stimulation of the well. Once stimulation is complete, the bradenhead pressure shall be recorded at 24 hours, at 48 hours and at one week post-stimulation. Bradenhead pressures greater than 100 psi must be immediately reported on a Form 17 to the COGCC, sent to the attention of Ryan Hollinshead.
8)All bradenhead pressures shall be monitored with a gauge that has a maximum reading of one thousand pounds per square inch (psi).
9)Circulation prior to cementing shall be done to accepted industry standards.
|
| Permit | Form: (02) 400187457 10/13/2011 | Water sampling required. Corrected feet to nearest well permitted...Opr notified. |
| Permit | Form: (02) 400455610 09/03/2013 | Operator must meet water well testing requirements per Rule 318A. |
| Engineer | Form: (02) 400455610 09/15/2013 | 1) Submit Form 42 electronically to COGCC 48 hours prior to MIRU.
2) Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with a cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
4) At least two weeks prior to spud notice, the centralizer and cementing plans shall be submitted to the COGCC for review on a Form 4, Sundry Notice.
5) At least one well on the pad must have a complete set of open hole logs (Compensated Neutron, Dual Induction, Resistivity, etc.) run from TD to surface and submitted to the COGCC.
6) Four hours prior to running any casing, notification shall be provided to Mike Hickey, COGCC Engineer at 303-894-2100 x5105.
7) Bradenhead pressures shall be taken 6, 12, 24 and 48 hours after cementing production casing and prior to stimulation of the well. Once stimulation is complete, the bradenhead pressure shall be recorded at 24 hours, at 48 hours and at one week post-stimulation. Bradenhead pressures greater than 100 psi must be immediately reported on a Form 17 to the COGCC, sent to the attention of Mike Hickey.
8) All bradenhead pressures shall be monitored with a gauge that has a maximum reading of one thousand pounds per square inch (psi).
9) Circulation prior to cementing shall be done to accepted industry standards. |
| Engineer | Form: (04) 402260740 12/19/2019 | Shut in bradenhead pressure shall not exceed 50 psig. |
| Engineer | Form: (04) 402260740 12/19/2019 | 1. Operator shall implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Prior to starting bradenhead abatement, if a sample has not been collected within the last twelve months collect bradenhead and production gas samples for laboratory analysis. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results shall be provided to the COGCC within three months of collecting the samples.
3. Bradenhead gas is not to be vented to atmosphere; any gas from the Bradenhead will be routed to an enclosed tank and/or combustor. Operator shall implement measures to get an initial estimate of the gas flow rate and/or volume from the bradenhead. The abatement program may be used for six consecutive months.
4. Operator will submit a Form 42 (“OTHER”) stating that “bradenhead abatement program has started.”
5. At the conclusion of the six months, conduct a new bradenhead test and submit the Form 17 within ten days of the test and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans and the flow rate information and pressure data. |
| Engineer | Form: (04) 403379733 04/26/2023 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Bradenhead gas is not to be vented to the atmosphere; any gas from the Bradenhead will be routed to an enclosed tank and/or combustor. Shut in bradenhead pressure shall not exceed 50 psig. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
3. By 11/10/23, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data.
4. Shut well in for at least seven days to monitor and collect data to characterize build up pressures then conduct a new bradenhead test and submit the Form 17 within ten days of the test.
5. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the COGCC within three months of collecting the samples.
|
| Engineer | Form: (04) 403948661 10/11/2024 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Bradenhead gas is not to be vented to the atmosphere; any gas from the Bradenhead will routed to to specified abatement system. Shut in bradenhead pressure shall not exceed threshold pressure 50 psig. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
3. No later than 9/25/25, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The well should be shut in for seven days to monitor and collect data to characterize build up pressures prior to conducting the bradenhead test. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data.
4. If a sample has not been collected from surface casing within the last twelve months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
|
| Engineer | Form: (04) 404499564 01/28/2026 | 1. Operator will implement measures to control venting, to protect health and safety, and to ensure that vapors and odors from well operations do not constitute a nuisance or hazard to public welfare.
2. Bradenhead gas is not to be vented to the atmosphere; any gas from the Bradenhead will be routed to the specified abatement system. Shut in bradenhead pressure shall not exceed threshold pressure. Operator will implement measures to get an estimate of the gas flow rate and/or volume from the bradenhead.
3. No later than 9/10/26, conduct a bradenhead test, submit a Form 17, and submit a Form 4 Sundry that summarizes current well condition. The well should be shut in for seven days to monitor and collect data to characterize build up pressures prior to conducting the bradenhead test. The sundry should include details of the future plans, sample analysis interpretation, bradenhead test description, and the flow rate information and pressure data.
4. If a sample has not been collected from surface casing within the last twenty-four months collect bradenhead gas samples for laboratory analysis. Sampling will comply with Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling. Copies of all final laboratory analytical results will be provided to the ECMC within three months of collecting the samples.
|