COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400201913
9/1/2011
A well being completed deeper than 2500 feet must be 600 feet from a lease line and be at least 1200 feet from a well permitted/producing from the same formation, or requires an approved exception location. per rule 318a.
EngineerForm: (02 )
400201913
9/12/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Plug back pilot hole as proposed on line 33 comments, or at a minimum: In addition to kick off plug set 60 sks cement from 50’ below D-Sand base to 100’ above D-Sand top and set 40 sks cement 50’ above Niobrara top.
EngineerForm: (02 )
400201917
9/12/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Provide cement coverage from base of intermediate casing to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
OGLAForm: (06 )
403491660
8/22/2023
Well is in a CPW mapped Mule Deer Severe Winter Range High Priority Habitat. Although plugging and abandonment operations with heavy equipment will be allowed, the Operator is strongly encouraged to avoid them between December 1 through April 30.
EngineerForm: (06 )
403491660
9/1/2023
Plugging 1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations.   2) Plugs and squeezes will be placed as stated in the Plugging Procedure section of the approved NOIA unless revised by COA or prior approval from ECMC is obtained. 3) The wellbore must be static prior to placing cement plugs which are to be a minimum of 100' in length for all but surface plugs. Mechanical isolation requires a 25' cement plug, minimum. For plugs not specified to be tagged, a tag is required if circulation is not maintained while pumping plug and displacing to depth. Tag at tops specified or shallower. Notify ECMC Area Engineer before adding cement to previous plug. 4) Place a 50' plug (minimum) at the surface, both inside the inner most casing and in all annular spaces. Surface plugs shall be circulated to surface. Document cement to surface in all strings during cut and cap. 5) With the Form 6 SRA operator must provide written documentation which positively affirms each COA has been addressed. 6) Operator must wait a sufficient time on all plugs to achieve the intended design. If at any time during the plugging there is evidence of previously unreported pressure or fluid migration, contact ECMC Area Engineer before continuing operations. 7) Plugging procedure as follows, Plug #1 - 5433-5233', CIBP with 40 sx of cement, NOTE change to volume, Plug #2 - 2550-2450', CIBP with 25 sx of cement , Plug #3 - 1850-1337', 105 sx csg plug to surface, Plug #4 - 750', perf and circulate 260 sx of cement to the surface, WOC and tag at 150' or shallower. Use caution to only perf the intermediate casing, Plug #5 - 50' of cement at the surface in both the casing and the annulus per COA #4. 8) Submit an updated WBD and plugging procedure that correspond to the approved 6(N) (if needed) prior to filing Form 42 Notifications required in COA #1 above.
EngineerForm: (06 )
403491660
9/1/2023
Properly abandon flowlines per Rule 1105. If flowlines will be abandoned in place, include with the Form 27: pressure test results conducted in the prior 12 months as well as identification of any document numbers for a ECMC Spill/Release Report, Form 19, associated with the abandoned line.
EngineerForm: (06 )
403491660
9/1/2023
Consistent with Rule 911.a, a Form 27 must be approved prior to cut and cap, conducting flowline abandonment, or removing production equipment. Allow 30 days for Director review of the Form 27; include the Form 27 document number on the Form 44 for offsite flowline abandonment (if applicable) and on the Form 6 Subsequent.
EngineerForm: (06 )
403491660
9/1/2023
Bradenhead Testing Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the ECMC within three (3) months of collecting the samples. If there is a need for sampling, contact ECMC engineering for verification of plugging procedure.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Material Handling and Spill PreventionForm: (02 )
400201913
9/30/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400201913
9/30/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400201913
9/30/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400201913
9/30/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02 )
400201913
9/30/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400201913
9/30/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400201913
9/30/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02 )
400201913
9/30/2011
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.
Material Handling and Spill PreventionForm: (02 )
400201917
9/30/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids.
Storm Water/Erosion ControlForm: (02 )
400201917
9/30/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing.
Site SpecificForm: (02 )
400201917
9/30/2011
Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use.
Material Handling and Spill PreventionForm: (02 )
400201917
9/30/2011
Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit/Pond.
Site SpecificForm: (02 )
400201917
9/30/2011
Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400201917
9/30/2011
The location will be fenced and the fenced area will include the Fresh Water Storage Pit.
Pre-ConstructionForm: (02 )
400201917
9/30/2011
The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
PlanningForm: (02 )
400201917
9/30/2011
A Form 15 Pit Report will be submitted within 30 days of construction of the fresh water storage pit.