Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-34205Perrin
1-10H
STRACHAN EXPLORATION INC
83130
SI
2/1/2026
WATTENBERG
90750
WELD  123
NENE 10 7N62W 6
424875View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400185580
07/26/2011
1)Note surface casing setting depth change from 550’ to 720’. Increase cement coverage accordingly and cement to surface. 2)Provide 24 hour notice of MIRU to Bo Brown via e-mail at bo.brown@state.co.us. 3)Comply with Rule 317.i and provide cement coverage from the end of the production casing to a minimum of 200' above the Niobrara. Verify coverage with cement bond log. 4)Comply with Rule 321. Run and submit Directional Survey from the end of production casing to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
No records to display.