WELL05-123-33955Pergamos
3-44-7-60
VERDAD RESOURCES LLC
10651
SI
2/1/2024
DJ HORIZONTAL NIOBRARA
16950
WELD  123
SESE 3 7N60W 6
424238View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400170952
6/29/2011
A well being completed deeper than 2500 feet must be 600 feet from a lease line or requires an approved exception location. per rule 318a..
EngineerForm: (02 )
400170952
7/1/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Plug back pilot hole as proposed on line 33 comments or at a minimum: Set 70 sks cement from 50’ below D-Sand base to 100’ above D-Sand top. Set 40 sks cement 50’ above Niobrara top. This is in addition to kick off plug.
EngineerForm: (02 )
400170978
7/1/2011
1) Provide 24 hour notice of MIRU to Colby Horton at 970-467-2517 or e-mail at colby.horton@state.co.us. 2) Provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 3) Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Drilling/Completion OperationsForm: (02 )
400170952
7/14/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use. Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit. Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400170952
7/14/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing. The location will be fenced and the fenced area will include the Fresh Water Storage Pit. The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.
Drilling/Completion OperationsForm: (02 )
400170978
7/14/2011
Operator will ensure 110 percent secondary containment for any volume of fluids contained at the well site during drilling and completion. Operator will implement best management practices to contain any unintentional release of fluids. Fresh water for the Fresh Water Storage Pit comes from water provider; water sources permitted for consumable industrial use. Operator shall not allow any fluids to flow back to the Fresh Water Storage Pit. Fresh Water Storage Pit shall contain fresh water only and signage prohibiting the use of the pit for any fluid that does not come from municipal, irrigation or surface water source.
ConstructionForm: (02 )
400170978
7/14/2011
Operator has designed the well pad with insloping and a storm water control ditch to prevent storm water run-on/runoff and the release of fluids from the location. See attached Construction Layout Drawing. The location will be fenced and the fenced area will include the Fresh Water Storage Pit. The COGCC to be notified 48 hours prior to construction of the Fresh Water Storage Pit.