| General Housekeeping | Form: (04 ) 402971621 3/17/2022 | Lights: This is a daylight operation only; no impact is anticipated from lighting. |
| Storm Water/Erosion Control | Form: (04 ) 402971621 3/17/2022 | Operator will review the stormwater program and implement stormwater BMPs and erosion control measures to prevent fine-grained sediment and impacted stormwater runoff from entering surface water. |
| Material Handling and Spill Prevention | Form: (04 ) 402971621 3/17/2022 | During workover operations we will have spill containment under all equipment and will have straw wattles around the whole location. |
| Dust control | Form: (04 ) 402971621 3/17/2022 | If needed, water will be placed on dirt access roads to mitigate dust. |
| Noise mitigation | Form: (04 ) 402971621 3/17/2022 | Noise: Because the operation is daylight only, no impact is anticipated during evenings. Based off the rig sound signature, rig orientation will be considered to reduce noise levels to nearby building units. Noise levels will be maintained in compliance with Table 423-1 |
| Odor mitigation | Form: (04 ) 402971621 3/17/2022 | Odor: Closed, upright tanks are being utilized to mitigate odor. |