COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
PermitForm: (02 )
400133302
3/23/2011
Operator must meet water well testing requirements as per amended Rule 318
EngineerForm: (02 )
400133302
3/24/2011
1) Provide 24 hr notice of MIRU to Ed Binkley at 970-506-9834 or e-mail at ed.binkley@state.co.us. 2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC. 3) If completed, provide cement coverage from the intermediate casing shoe to a minimum of 200' above Niobrara. Verify cement with a cement bond log. 4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (04 )
401341331
2/21/2018
This approval is good for one year and a new application must be made before July 13, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application
EngineerForm: (04 )
401182709
2/21/2018
This approval is good for one year and a new application must be made before January 11, 2018(1 year from prior application). Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
401877650
1/9/2019
This approval is good for one year and a new application must be made before June 30, 2019. Updates for the planned utilization of the well should be included with the application. If the well is not returned to production within two years(of the initial pressure test-1/11/2017) an MIT will be performed.
EngineerForm: (04 )
401896981
1/11/2019
This approval is good for one year and a new application must be made before June 30, 2019. Updates for the planned utilization of the well should be included with the application. If the well is not returned to production within two years(of the initial pressure test-1/11/2017) an MIT will be performed.
EngineerForm: (04 )
402250280
2/26/2020
This approval is good for one year and a new application must be made before January 2, 2021. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402250280
2/26/2020
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402558429
1/4/2021
This approval is good for one year and a new application must be made before December 30, 2021. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402558429
1/4/2021
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04 )
402900784
12/16/2021
This approval is good for one year and a new application must be made before December 16, 2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04 )
402900784
12/16/2021
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
 
COGIS - Best Management Practice Results
BMP TypeSource DocumentBest Management Practices
Storm Water/Erosion ControlForm: (02 )
400133302
4/11/2011
Stormwater management plans (SWMP) are in place to address construction, drilling and operations associated with Oil & Gas development throughout the state of Colorado in accordance with Colorado Department of Public Health and Environment (CDPHE) General Permit No. COR-039527. BMP's will be constructed around the perimeter of the site prior to, or at the beginning of construction. BMP's used will vary according to the location, and will remain in place until the pad reaches final reclamation.
General HousekeepingForm: (02 )
400133302
4/11/2011
Housekeeping will consist of neat and orderly storage of materials and fluids. Wastes will be temporarily stored in sealed containers and regularly collected and disposed of at offsite, suitable facilities. If spills occur prompt cleanup is required to minimize any commingling of waste materials with stormwater runoff. Routine maintenance will be limited to fueling and lubrication of equipment. Drip pans will be used during routine fueling and maintenance to contain spills or leaks. Any waste product from maintenance will be containerized and transported offsite for disposal or recycling. There will be no major equipment overhauls conducted onsite. Equipment will be transported offsite for major overhauls. Cleanup of trash and discarded materials will be conducted at the end of each work day. Cleanup will consist of patrolling the roadway, access areas, and other work areas to pickup trash, scrap debris, other discarded materials, and any contaminated soil. These materials will be disposed of properly.
Material Handling and Spill PreventionForm: (02 )
400133302
4/11/2011
Spill Prevention Control and Countermeasures (SPCC) plans are in place to address any possible spill associated with Oil & Gas operations throughout the state of Colorado in accordance with CFR 112.