Engineer | Form: (02 ) 400075383 2/28/2011 | 1) Provide 24 hr notice of spud to Bo Brown at 970-330-6085 or email at bo.brown@state.co.us.
2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC.
3) If completed, provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log.
4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
5) If dry hole, 40 sks cement 50’ above Niobrara top, 50 sks cement ½ out, ½ in surface casing, 10 sks cement top of surface casing, cut 4’ below GL, weld on plate, 5 sks cement in rat hole & 5 sks cement in mouse hole. Restore surface location.
|
Engineer | Form: (04 ) 402214343 12/26/2019 | This approval is good for one year and a new application must be made before October 18, 2020. Updates for the planned utilization of the well should be included with the application.
|
Engineer | Form: (04 ) 402214343 12/26/2019 | The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
|
Engineer | Form: (04 ) 402497649 11/24/2020 | With next year’s sundry provide a more specific plan forward. Merely specifying that the well will be plugged or RTP before the next MIT is not sufficient.
EG. Bonanza Creek is working through a large backlog of PA work. Based on budgeting, Bonanza Creek currently plans to plug a total of AAA wells in in 2020, and BBB wells in 2021. Thus far, Bonanza Creek has plugged CCC wells in 2020 and is on track to meet our annual target. Currently, this well is planned to be plugged in 2021.
This type of comment demonstrates that Bonanza Creek has a concrete plan forward and that said plan is being acted upon. Furthermore, this doesn't require an overly specific timeline for each well (which we understand is challenging to plan).
|
Engineer | Form: (04 ) 402497649 11/24/2020 | This approval is good for one year and a new application must be made before 10/7/21. Updates for the planned utilization of the well should be included with the application |
Engineer | Form: (04 ) 402802205 10/5/2021 | 1) This approval is good for one year and a new application must be made before 9/29/2022. Updates for the planned utilization of the well should be included with the application.
|
Engineer | Form: (04 ) 403097355 7/18/2022 | This well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022. |