Skip to Main Content

COGIS DB

 
Facility TypeFacility ID/
API
Facility Name/
Number
Operator Name/
Number
StatusField Name/
Number
LocationLocation IDRelated Facilities
WELL05-123-33065Fiscus Mesa
09-10H
NOBLE ENERGY INC
100322
PA
9/29/2017
DJ HORIZONTAL NIOBRARA
16950
WELD  123
NWNW 10 9N58W 6
421742View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02 )
400118702
1/18/2011
Note surface casing setting depth change from 800’ to 1050’. Increase cement coverage accordingly and cement to surface. 1) Provide 24 hr notice of MIRU to Colby Horton at 970-370-0040 or colby.horton@state.co.us. 2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC. 3) If completed, provide cement coverage from the intermediate casing shoe to a minimum of 200' above Niobrara. Verify cement with a cement bond log. 4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (02 )
400141899
3/15/2011
1) Provide 24 hr notice of MIRU to Colby Horton at 970-370-0040 or colby.horton@state.co.us. 2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC. 3) If completed, provide cement coverage from the intermediate casing shoe to a minimum of 200' above Niobrara. Verify cement with a cement bond log. 4) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
EngineerForm: (06 )
401309790
7/10/2017
1) Provide 48 hour notice of MIRU via electronic Form 42. 2) Shoe plug: Run CBL to confirm TOC at 970'. Adjust procedure accordingly to achieve cement plugs in 7" casing and in 7"x 9.625" annulus at: 1400'-1060' (from 100' below Upper Pierre aquifer to 50' above surface casing shoe), 600'-500' (isolates between U. Pierre aquifer and base of Fox Hills). 3) Surface plug: Cement from 50' to surface in casing and annulus. 4) Properly abandon flowlines per Rule 1103. File Form 42 when done. 5) Abandoned well marker shall be inscribed with the well identification per Rule 319.a.(5).
EngineerForm: (06 )
401309790
7/10/2017
Bradenhead: Prior to initiation of plugging operations, a Bradenhead test shall be performed. Form 17 shall be submitted within 10 days. If there is 25 psi or greater pressure on the Bradenhead, or flowed any liquids from the Bradenhead, collect samples. See COGCC website - Operator Guidance - Bradenhead Testing and Reporting Instructions, Appendix A: Liquid and Gas Sampling.
 
COGIS - Best Management Practice Results
No records to display.