WELL05-123-32833Antelope
41-31
BONANZA CREEK ENERGY OPERATING COMPANY LLC
8960
PA
2/9/2023
WATTENBERG
90750
WELD  123
NENE 31 5N62W 6
421165View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
EngineerForm: (02)
400097682
12/27/2010
1) Provide 24 hr notice of spud to Bo Brown at 970-330-6085 or email at bo.brown@state.co.us. 2) Set surface casing per Rule 317d, cement to surface. Setting surface casing less than the approved depth is a permit violation unless prior written approval is obtained from the COGCC. 3) If completed, provide cement coverage from TD to a minimum of 200' above Niobrara. Verify coverage with cement bond log. 4) If dry hole, 40 sks cement 50’ above Niobrara top, 50 sks cement ½ out, ½ in surface casing, 10 sks cement top of surface casing, cut 4’ below GL, weld on plate, 5 sks cement in rat hole & 5 sks cement in mouse hole. Restore surface location.
EngineerForm: (04)
402126025
12/20/2019
This approval is good for one year and a new application must be made before July 29, 2020. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402126025
12/20/2019
The Form 7 reporting must reflect the well status dates reported on the Form 4-TA request.
EngineerForm: (04)
402447085
11/12/2020
With next year’s sundry provide a more specific plan forward. Merely specifying that the well will be plugged or RTP before the next MIT is not sufficient. EG. Bonanza Creek is working through a large backlog of PA work. Based on budgeting, Bonanza Creek currently plans to plug a total of AAA wells in in 2020, and BBB wells in 2021. Thus far, Bonanza Creek has plugged CCC wells in 2020 and is on track to meet our annual target. Currently, this well is planned to be plugged in YYYY. This type of comment demonstrates that Bonanza Creek has a concrete plan forward and that said plan is being acted upon. Furthermore, this doesn't require an overly specific timeline for each well (which we understand is challenging to plan).
EngineerForm: (04)
402447085
11/12/2020
This approval is good for one year and a new application must be made before 7/29/21. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
402710302
08/13/2021
1) This approval is good for one year and a new application must be made before 7/19/2022. Updates for the planned utilization of the well should be included with the application.
EngineerForm: (04)
403096347
07/07/2022
1) This well is designated inactive and must be properly returned to production, plugged and abandoned, have an approved Form 5B or be submitted on a Form 6A (to be designated as Out of Service) no later than no later than November 1, 2022.
OGLAForm: (06)
403082621
07/13/2022
Prior to commencing operations, the operator will post signs in conspicuous locations. The signs will indicate plugging and abandonment operations are being conducted, the well name, well, and the applicable contact information. Signs will be placed so as not to create a potential traffic hazard.
OGLAForm: (06)
403082621
07/13/2022
Prior to commencing operations, at a minimum, the operator will provide an informational sheet to the owners of parcels that are adjacent to the parcel on which the well is located. The sheet will include the operator's contact information and the nature, timing, and expected duration of the PA operations.
EngineerForm: (06)
403082621
07/21/2022
1) Provide electronic Form 42 Notice of MIRU 2 business days ahead of operations and electronic Form 42 Notice of Plugging Operations 48 hours prior to mobilizing for plugging operations. 2) Prior to placing the 482’ plug: verify that all fluid migration (liquid and gas) has been eliminated. If evidence of fluid migration or pressure remains, contact COGCC Engineer for an update to plugging orders. 3) After isolation has been verified, pump surface casing shoe plug. If cement is not circulated to surface, shut-in, WOC 4 hours then tag plug – must be at AAA’ or shallower and provide 10 sx plug at the surface. 4) Leave at least 100’ of cement in the wellbore for each plug without mechanical isolation. 5) With the Form 6 SRA operator must provide written documentation which positively affirms each COA listed above has been addressed.
EngineerForm: (06)
403082621
07/21/2022
Prior to starting plugging operations a bradenhead test shall be performed if there has not been a reported bradenhead test within the 60 days immediately preceding the start of plugging operations. 1) If, before opening the bradenhead valve, the beginning pressure is greater than 25 psi, sampling is required. 2) If pressure remains at the conclusion of the test, or if any liquids were present during the test, sampling is required. The Form 17 shall be submitted within 10 days of the test. Sampling shall comply with Operator Guidance - Bradenhead Testing and Reporting Instructions. If samples are collected, copies of all final laboratory analytical results shall be provided to the COGCC within three (3) months of collecting the samples. If there is a need for sampling, contact COGCC engineering for verification of plugging procedure.
 
COGIS - Best Management Practice Results
No records to display.