Agency | Form: (02 ) 400074059 7/28/2010 | 1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us
2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well. |
Engineer | Form: (06 ) 401268304 5/4/2017 | 1) Provide 48 hour notice of plugging MIRU via electronic Form 42.
2) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete.
3) Plug listed as half in-half out surface casing is actually production casing stub plug that will also cover the surface casing shoe. This plug must be tagged at 400’ or 50’ above depth production casing is cut and pulled, whichever is shallower. Leave at least 100’ of cement in the wellbore for each plug. |