Agency | Form: (02 ) 400035249 3/17/2010 | 1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
Agency | Form: (02 ) 400035249 3/17/2010 | Location is outside the drilling window; exception granted |
Engineer | Form: (06 ) 400342538 12/5/2012 | 1) Provide 24 hour notice of MIRU to Mike Hickey at 970-302-1024 or e-mail at Mike.Hickey@state.co.us. 2) For 1750’ plug: pump plug and displace, shut-in, WOC 4 hours and tag plug – must be 950’ or shallower. Leave at least 100’ cement in the casing for each plug. 3) Properly abandon flowlines as per Rule 1103. |