WELL05-123-30943STATE
1-16
KERR MCGEE OIL & GAS ONSHORE LP
47120
PA
11/29/2017
WATTENBERG
90750
WELD  123
NENW 16 1N68W 6
414828View Related
 
COGIS - Conditions of Approval Results
TypeSource DocumentConditions of Approval
AgencyForm: (02)
400007004
12/21/2009
Location is outside of GWA window and is more than 50 feet from nearest existing well exception has been granted.
AgencyForm: (02)
400007004
12/21/2009
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us 2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log. 3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
AgencyForm: (02)
400007004
12/21/2009
Location is outside of GWA window and is more than 50 feet from nearest existing well exception has been granted.
PermitForm: (05)
2555804
10/20/2010
CMT SUMMARY(DOC 2556706) WITH FINAL FORM 5 (DOC 256704). ENTERED DIRECTIONAL SURVEY 2555805 - IT WAS CORRECT.
PermitForm: (05)
2556704
10/20/2010
PRELIMINARY FORM 5 DOC 2555804. ENTERED DIRECTIONAL SURVEY 2555805 - IT WAS CORRECT.
EngineerForm: (04)
400720294
11/04/2014
The additional cement referenced shall be placed as indicated and comply with Rule 317.j. The placed cement shall be verified with a CBL and documented with a Form 5 Drilling Completion Report.
EngineerForm: (06)
401289446
06/09/2017
1) Prior to starting plugging operations a bradenhead test shall be performed. If the beginning pressure is greater than 25 psi, or if pressure remains at the conclusion of the test, or if any liquids were present contact COGCC Engineer for sampling requirements. The Form 17 shall be submitted within 10 days of the test. 2) Provide 48 hour notice of plugging MIRU via electronic Form 42. 3) Properly abandon flowlines as per Rule 1103. File electronic Form 42 once abandonment complete. 4) Leave at least 100’ of cement in the wellbore for each plug.
 
COGIS - Best Management Practice Results