| Agency | Form: (02) 1759193 10/14/2009 | <style type="text/css">
p {margin:0px 0px 0px 2px;}
ul {margin-top:2px;margin-bottom:2px;}
ol {margin-top:2px;margin-bottom:2px;}
H1 {font-family:Arial;font-size:28px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H2 {font-family:Arial;font-size:24px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
H3 {font-family:Arial;font-size:18px;text-align:Left;vertical-align:Middle;color:#000000;font-weight:bold;}
.Normal {font-family:Arial;font-size:14px;text-align:Left;vertical-align:Middle;color:#000000;}
.TableDefault {border-collapse:collapse;border:1px solid #000000;}
.TableDefault th {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
.TableDefault td {padding:2px;vertical-align:top;text-align:left;border:1px solid #000000;}
</style>
<p><span class="Normal">1) Note surface casing setting depth change from 500’ to 750’. Increase cement coverage accordingly and </span><span class="Normal">cement to surface. 2) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at </span><span class="Normal">james.precup@state.co.us 3) Comply with Rule 317.i and provide cement coverage from TD to a minimum of </span><span class="Normal">200' above Niobrara. Evaluate Shannon and Sussex and cement from 200’ above to 200’ below these </span><span class="Normal">formations if potentially productive. Verify coverage with cement bond log. 4) Run and submit Directional </span><span class="Normal">Survey from TD to base of surface casing.</span></p>
|
| Engineer | Form: (02) 400201315 09/23/2011 |
1) Provide 24 hour notice of MIRU to Jim Precup at 303-469-1902 or e-mail at james.precup@state.co.us
2) Comply with Rule 317.i and provide cement coverage from TD to a minimum of 200' above Niobrara and from 200’ below Shannon to 200’ above Sussex. Verify coverage with cement bond log.
3) Comply with Rule 321. Run and submit Directional Survey from TD to base of surface casing. Ensure that the wellbore complies with setback requirements in commission orders or rules prior to producing the well.
|
| Permit | Form: (04) 400504503 11/04/2013 | FIELD INSPECTION WILL BE CONDUCTED TO DETERMINE SITE STATUS
|